As you can see in the image below the house is again a 3 bedroom house. The downstairs bedroom is painted. I have doors on order for the closet. And the floor and trim needs to go in. But the hard part is mostly done.



I also drywalled the area out side the bedroom. Still needs joint compound. But I need to wait until I finish the plumbing for the bathroom, so I can drywall that wall.



And the bathroom is framed in. I put the cat litter box in place where the toilet goes.



Oh. We decided we liked the floor so much in the bathroom, it's staying. I saved all the pieces that were removed to put the wall in.

Joe

 